Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · CFR · Title 30 — Mineral Resources · Part 800 · § 800.17

§ 800.17. Bonding requirements for underground coal mines and long-term coal-related surface facilities and structures.

373 words·~2 min read·/us/cfr/t30/s§ 800.17·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)Responsibilities. The regulatory authority shall require bond coverage, in an amount determined under § 800.14, for long-term surface facilities and structures, and for areas disturbed by surface impacts incident to underground mines, for which a permit is required. Specific reclamation techniques required for underground mines and long-term facilities shall be considered in determining the amount of bond to complete the reclamation.
(b)Long-term period of liability.
(1)The period of liability for every bond covering long-term surface disturbances shall commence with the issuance of a permit, except that to the extent that such disturbances will occur on a succeeding increment to be bonded, such liability will commence upon the posting of the bond for that increment before the initial surface disturbance of that increment. The liability period shall extend until all reclamation, restoration, and abatement work under the permit has been completed and the bond is released under the provisions of § 800.40, or until the bond has been replaced or extended in accordance with § 800.17(b)(3).
(2)Long-term surface disturbances shall include long-term coal-related surface facilities and structures, and surface impacts incident to underground coal mining, which disturb an area for a period that exceeds 5 years. Long-term surface disturbances include, but are not limited to: surface features of shafts and slope facilities, coal refuse areas, powerlines, bore-holes, ventilation shafts, preparation plants, machine shops, roads, and loading and treatment facilities.
(3)To achieve continuous bond coverage for long-term surface disturbances, the bond shall be conditioned upon extension, replacement, or payment in full, 30 days prior to the expiration of the bond term.
(4)Continuous bond coverage shall apply throughout the period of extended responsibility for successful revegetation and until the provisions of § 800.40 have been met.
(c)Bond forfeiture. The regulatory authority shall take action to forfeit a bond pursuant to this section, if 30 days prior to bond expiration, the operator has not filed:
(1)A performance bond for a new term as required for continuous coverage, or
(2)a performance bond providing coverage for the period of liability, including the period of extended responsibility for successful revegetation. \[48 FR 32959, July 19, 1983, as amended at 81 FR 93381, Dec. 20, 2016; 82 FR 54972, Nov. 17, 2017\]
Connections6 cite this
Citation graph
cites case law
§ 800.17
Bonding requirements for underground coal mines and long-term coal-related surface facilities and structures.
Fed. Reg.×6
Cites 0Cited by 6 across 1 source
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.